国产精品永久免费视频- 无码精品A∨在线观看中文 -热re99久久精品国产99热-国产成人久久777777

Tracklayer witnesses transportation expand in Tibet

Xinhua | Updated: 2019-04-07 07:43
Share
Share - WeChat
A worker from the China Railway 11 Bureau Group prepares to lay track for the Lhasa-Nyingchi Railway, March 7, 2019. [Photo/Xinhua]

More than 15 years ago, Wang volunteered to join the building of the Qinghai-Tibet Railway. It was a tough job, since 85 percent of the railway was constructed in areas more than 4,000 meters above sea level. The areas have an annual average temperature below zero degree Celsius, and oxygen in most of these areas is only about 50 percent to 60 percent of that in plain areas.

|<< Previous 1 2 3 4 5 6 7 8 9 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US