国产精品永久免费视频- 无码精品A∨在线观看中文 -热re99久久精品国产99热-国产成人久久777777

 
 

Home/Our Business/Equipment Installation

Electromechanical Equipment Installation at the Geheyan Hydropower Station (China)

Updated: 2014-04-01

CGGC is the prime contractor for the four generator units at the Geheyan Hydropower Station, each having a single-unit capacity of 300MW.

Electromechanical Equipment Installation at the Geheyan Hydropower Station (China)

Electromechanical Equipment Installation at the Geheyan Hydropower Station

 

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.