国产精品永久免费视频- 无码精品A∨在线观看中文 -热re99久久精品国产99热-国产成人久久777777

 
 

Home/Our Business/Equipment Installation

Installation and Completion of a Double-way Five-stage Ship Lock in the Three Gorges Project (China)

Updated: 2014-04-01

In the Three Gorges Project, CGGC was responsible for installing all the metal structures and electromechanical equipment used for the permanent ship lock, which is of the largest scale, the most complex technology and the biggest difficulty in the world.

Installation and Completion of a Double-way Five-stage Ship Lock in the Three Gorges Project (China)

Installation and Completion of a Double-way Five-stage Ship Lock in the Three Gorges Project

 

 

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.